Sewer Collection

The Sewer Collection division is responsible for:

  • Operation and maintenance of over 127 miles of sanitary sewers and over 9,000 service laterals.
  • Operation and maintenance of six sewage lift stations
  • Operation and maintenance of over seven miles of force main originating from Honda of America’s facility located on Meranda Road
  • Operation and maintenance of two miles of force main originating from Port Jefferson
  • During the summer months performs inflow and infiltration reduction work which includes:
    • Replacement of manholes with sealed frames and lids
    • Smoke testing of the sewers to identify points of water intrusion
    • Televising of the city mains to identify broken, collapsed or separated sewer mains
  • Assisting in the review of Development Plans
  • Performing OUPS utility locates

Annual Reports